Living In PoncaTourismCity GovernmentChamber of CommerceEconomic Development
DepartmentsMayor and CommissionCode, Bids, ProjectsForms & ApplicationsWiFiWorking for the City
Location : City Government > Departments > Development Services > Engineering > Right of Way Permits
For Information

RIGHT OF WAY PERMITS

 

$10.00 EACH

9-2-5:  INSURANCE AND BOND REQUIREMENTS:

No person shall construct, reconstruct, repair or remove any pavement, walk, drive, curb or gutter within any public way or make any excavation therein without having first complied with the following requirements.

A.     Insurance: Having filed with the City Clerk a certificate of insurance issued by an insurance company licensed to do business in the state of Oklahoma, in the minimum amounts as prescribed below:

 

Comprehensive liability, each individual       $ 50,000.00

Property damage, per accident                            25,000.00  

Aggregate amount, each occurrence                100,000.00  

 

All liability insurance policies shall name the city of Ponca City as an additional insured and shall otherwise indemnify the city from any claim arising out of any act, omission, or negligence on the part of a person insured.

B.      Bond:  Having deposited with the city an approved performance bond in the amount of ten thousand dollars ($10,000.00) conditioned that the contractor and/or his surety will remove any work not executed in accordance with the specifications hereinafter set forth, and replace the same to the satisfaction of the city.  Provided that this provision shall not apply to a public utility concern having a franchise for the use of the public ways.  (1980 Code § 30-4-; amd. 2003 Code)

Copyright © 2008 myponcacity.com